Boise State University Albertsons Stadium North End Zone Expansion

Boise, ID

The North End Zone Project showcases glulam beams and cross-laminated timber (CLT) as the primary structural elements for the concourse club ceiling and roof. The project intentionally selected these mass timber elements to create a warm, inviting architectural expression while reducing the project’s carbon footprint.

The project transforms the fan and student-athlete experience by replacing existing bleacher seating with a permanent, state-of-the-art structure. Featuring 1,600 premium seats and additional enhancements including a new open-air sports bar, expanded concourses for improved movement and access, and additional restrooms and concession kiosks, all with the goal of creating a first-class game-day environment. This thoughtful use of natural wood materials reflects the team’s commitment to sustainability, performance, and a distinctive aesthetic befitting Boise State University.

Version History
  • Project uploaded by WoodWorks Innovation Network (WIN) on 03-03-2026
  • Project last updated by WoodWorks Innovation Network (WIN) on 03-03-2026
Project Details
  • Year Built

    2026

  • Number Of Stories

    2

  • Bldg system

    Mass Timber

  • Sq. Meters

    8,570

  • Construction Type:

    I-A

  • Building Type:

    Civic (Recreational)

  • Material Types:

    Mass Timber
    Glue-Laminated Timber (GLT or glulam)
    Hybrid (wood with steel or concrete)

Project Team
Firms with linked profiles are WIN members. As a non-profit, WIN is made possible through membership.
Version History
  • Project uploaded by WoodWorks Innovation Network (WIN) on 03-03-2026
  • Project last updated by WoodWorks Innovation Network (WIN) on 03-03-2026
Need help with your own project?

WoodWorks can help find a team, technical details, and more.