- Project last updated by WoodWorks on 08-15-2024
Brentwood Public Library
Brentwood, CABrentwood Library, across from City Hall, replaces the small storefront library on that site and incorporates a vibrant children’s section that can be opened onto a secure outdoor reading room. A large community meeting room is attached to the Library and shares services - situated so that it can be used independently outside of Library hours. The western corner of the building, facing the City Park, offers a landscaped entry plaza and a small cafe with third-party vendor operation. The second story of the building is open at the center, allowing daylight and space conditioning to penetrate deep into the square floorplate.
The Library includes a double-height space over the lobby and features exposed cross-laminated timber floor and roof decks, and exposed steel framing. The project includes a CLT diaphragm on the roof and floor plates, which utilize plywood splines and screws to drag lateral loads into steel moment-resisting frames.
Project Details
- 
                      Number Of Stories2 
- 
                      Bldg systemMass Timber 
- 
                      
                        Sq. Meters1,923 
- 
                      Construction Type:V-B 
- 
                      Building Type:Civic (Recreational) 
- 
                      Material Types:Cross-Laminated Timber (CLT) 
 Hybrid (wood with steel or concrete)
Project Team
- 
                      
                        
                      
                      Holmes Structural Engineer
- 
                      
                        
                      
                      Megan Stringer Structural Engineer
- 
                      
                        
                      
                      Zander Sivyer Structural Engineer of Record
- 
                      Benjamini & Associates Civil Engineer
- 
                      Blanco Building Envelope Envelope Consultant
- 
                      Brandon Marshall Project Manager
- 
                      CALA Landscape Architect
- 
                      FOG Studio Architect
- 
                      Interface Engineering MEP Engineer
- 
                      Lathrop Construction General Contractor
- 
                      Mark Davis Interior Architect
- 
                      Mark Davis Design Architect
- 
                      Tiffany Redding Project Architect
- 
                      mack5 Cost Estimation
- Project last updated by WoodWorks on 08-15-2024
