Frog Lake First Nations’ Children & Family, Intervention and Prevention Horse Healing Centre

Frog Lake, AB

Set against a gently rolling landscape, the Centre utilizes the natural topography, cascading down the lower southern slope, which helps direct surface runoff into a pond that serves as a skating rink during winter months
Concrete piling supports the locally sourced Spruce-Pine-Fir (SPF) glulam beams, configured in free-flowing curves and spanning over the open arena. GLT roof panels were selected to accommodate the roof’s curvature.
Thin, horizontally staggered, thermally treated cedar planks clad much of the exterior, contrasting with the stone which clads around the cultural room and museum

Version History
Project Details
  • Year Built

    2026

  • Number Of Stories

    2

  • Bldg system

    Mass Timber

  • Sq. Meters

    1,149

  • Building Type:

    Educational

  • Material Types:

    Mass Timber

Version History
Need help with your own project?

WoodWorks can help find a team, technical details, and more.

WiA Announcement