John Burroughs Elementary School Modernization – Mass Timber Addition

Washington, DC

The John Burroughs Elementary School modernization in Washington, D.C. incorporates mass timber into a major renovation and expansion of the historic school campus. The new timber scope includes approximately 24,700 square feet of construction using CLT panels with glulam columns and beams. The prefabricated timber system is being erected as part of the broader modernization, which expands and reorganizes the campus while preserving significant portions of the original 1920s school. Mass timber is used prominently within the new addition and courtyard/common spaces, introducing exposed wood structure into the learning environment while supporting efficient installation and lower-carbon construction. The project is targeting LEED Gold and will increase the school's overall area to approximately 95,000 square feet.

Version History
  • Project uploaded by WoodWorks on 10-02-2026
  • Project last updated by WoodWorks on 10-02-2026
Project Details
  • Year Built

    2027

  • Number Of Stories

    2

  • Bldg system

    Mass Timber

  • Sq. Meters

    8,825

  • Construction Type:

    III-B

  • Building Type:

    Educational

  • Material Types:

    Mass Timber
    Cross-Laminated Timber (CLT)
    Glue-Laminated Timber (GLT or glulam)
    Hybrid (wood with steel or concrete)

Project Team
Firms with linked profiles are WIN members. As a non-profit, WIN is made possible through membership.
Version History
  • Project uploaded by WoodWorks on 10-02-2026
  • Project last updated by WoodWorks on 10-02-2026
Need help with your own project?

WoodWorks can help find a team, technical details, and more.

Mass Timber + 2026