- Project last updated by WoodWorks on 04-28-2026
Primeiro Edifício de Madeira
São Paulo, SPFirst Mass Timber Building This project uses a post-and-beam structural system combined with CLT (cross-laminated timber) slabs. The roof system is a thermoplastic membrane, and the floor system consists of CLT panels. The walls are constructed using a combination of CLT and wood frame systems. Photography by Fran Parente.
Project Details
-
Year Built
2023
-
Number Of Stories
3
-
Bldg system
Mass Timber
-
Square footage
1400
-
Construction Type:
II-B
-
Building Type:
Business (Office)
-
Material Types:
Mass Timber
Cross-Laminated Timber (CLT)
Wood structural panels
Project Team
-
Rothoblaas fasteners
-
Fran Parente Photography
-
MFMM Arquiteturaa Architect
-
Pedra Forte e Máximo Arquitetura e Engenharia General Contractor
- Project last updated by WoodWorks on 04-28-2026
