- Project uploaded by Scott Charney on 03-20-2025
- Project last updated by WoodWorks on 05-07-2025
University Of Scranton Workforce Development
Scranton, PA3 story Mass Timber Surrounded by Steel structure for University of Scranton Workforce Development Center.
Project Details
- 
                      Année de construction2025 
- 
                      Number Of Stories3 
- 
                      SystèmeBois massif 
- 
                      
                        Mètres carrés863 
- 
                      Type de construction:IV-A 
- 
                      Type de bâtiment:Éducatif 
- 
                      Types de matériaux:Bois massif 
 Bois lamellé-croisé
 Bois Lamellé-Collé
 Hybride
Project Team
- 
                      
                        
                      
                      Quality Buildings Contractor / Installer
- 
                      HC Architects Architect
- 
                      QUANDEL CONSTRUCTION GROUP, LLC General Contractor
- 
                      REUTHER + BOWEN Structural Engineer
- Project uploaded by Scott Charney on 03-20-2025
- Project last updated by WoodWorks on 05-07-2025
