- Project uploaded by Bill Broderick on 09-02-2025
- Project last updated by Bill Broderick on 10-22-2025
Lone Peak High School STEAM & Athletic Expansion
Gallatin Gateway, MTAdditions to Lone Peak High School and Ophir Middle School shared two priorities: prepare innovative learning spaces for the exploration of high-tech education, and provide proper athletic solutions for a school growing from Class C to Class B.
The design equipped the district with outstanding educational amenities and created a resource for the entire community for the next 50 years. New facilities and site improvements included a track and field expansion, site circulation plan, STEAM facility addition, classroom backfill, and a new common area. Aggressive building performance standards were incorporated, with an overall architectural emphasis on unifying the school campuses and showcasing the world-class education taking place inside.
Project Details
- 
                      Year Built2024 
- 
                      Number Of Stories1 
- 
                      Bldg systemMass Timber 
- 
                      
                        Sq. Meters1,579 
- 
                      Building Type:Educational 
- 
                      Material Types:Cross-Laminated Timber (CLT) 
 Glue-Laminated Timber (GLT or glulam)
Project Team
- 
                      
                        
                      
                      Foust Fab & Erectors Installer
- 
                      
                        
                      
                      Morrison-Maierle Engineer
- 
                      
                        
                      
                      Vaagen Timbers Glulam
- 
                      a&e design Architect
- Project uploaded by Bill Broderick on 09-02-2025
- Project last updated by Bill Broderick on 10-22-2025
