Canton, OH
Located in downtown Canton, Ohio, the Stark Library Phase 2 project will encompass 70,000 square feet across three floors and feature a large community meeting room. Groundbreaking is scheduled for spring 2026, with the grand opening anticipated in summer 2028.
Project Details
-
Year Built
2027
-
Number Of Stories
3
-
Bldg system
Mass Timber
-
Sq. Meters
6,656
-
Construction Type:
III-B
-
Building Type:
Civic (Recreational)
-
Material Types:
Mass Timber
Glue-Laminated Timber (GLT or glulam)
Timber-Frame / Post and Beam
Project Team
-
Timber Systems Contractor / Installer
-
Fred Olivieri Construction Construction Manager
-
HBM Architects Architect