Candlewood Suites on Ft. Drum
Fort Drum, NY-
Bldg system
Mass Timber
-
No. Of Stories
4
-
Sq. footage
65,000
This 65,000 SF, four-story, 100 room hotel was similar to the Redstone hotel but was designed as a hybrid structural system that included CLT for the floors, roofs, shafts, and bearing wall systems. The nonbearing walls utilized panelized engineered wood stud construction. Although prefabricated bath pods were not utilized on this project, the hybrid componentized structural systems were fabricated off-site, shipped, and installed on-site concurrent with the CLT superstructure without compromising structural performance.
This was the second structure in the PAL portfolio designed to meet the highly restrictive military Anti-Terrorism and Force Protection (ATFP) requirements. The hotel was 20% larger than the baseline Privatized Army Lodging (PAL) hotel, the workforce was 44% smaller, used 34% fewer manhours to complete the structure, and remained 24% faster, contributing to an overall (without POD's and prefab mechanical ducting) project schedule savings of 10%.
-
Construction Type:
III-A
-
Building Type:
Hotel/Motel
-
Material Types:
Cross-Laminated Timber (CLT), Glue-Laminated Timber (GLT or glulam)
Companies Involved:
-
Lendlease
Contractor
-
Luckett & Farley
Architect of Record
-
Schaefer
Structural Engineer
-
Stantec
Civil Engineers
-
Lendlease
Design / Build Contractor
-
Rest Easy, LLC
Owner / Developer
-
Lendlease
CLT Installer
-
Nordic Structures
Mass TImber Supplier