Trinity University Dicke Hall + Business and Humanities District

San Antonio, TX

When Trinity University decided to add a new building to their Business and Humanities District, it needed to complement two existing structures designed in the 1960s by renowned mid-century modernist architect O’Neil Ford. Lake Flato, whose founders originally met as young architects working in Ford’s office, chose mass timber for the new construction because it fit with Trinity’s innovative design heritage, and because it met the University’s sustainability goals.  
 
Three-story Dicke Hall, which features a lecture auditorium, classrooms, film screening room, and commons spaces, distinguishes itself with a clearly visible structure. Glulam columns made from naturally-durable Alaska yellow cedar flank the exterior while inside, Douglas fir glulam beams and columns support CLT floor and ceiling panels. Even  
the indoor stairway is wood. 
 
To take full advantage of mass timber’s capabilities, the design team used 5-ply CLT for all interior walls, including structural shear walls and elevator shafts. Leaving the panels exposed to the building’s interior highlights their strength in these vertical applications.  
 
The raised floor system, which hides electrical and mechanical systems, is another innovation. Five-ply CLT floor panels were covered with two inches of lightweight concrete and an acoustical mat, topped by an 8-inch-deep plenum. The system leaves just sprinklers and lighting overhead, eliminating the visual clutter of ductwork and other mechanicals while providing efficient air circulation and allowing flexibility for future redesigns. 
 
Although Dicke Hall added 34,438 square feet of program space, it increased campus energy demand by less than 1 percent. With a rooftop solar array, the new building is designed to use 90 percent less energy than a concrete and steel building of the same size and function. The efficient wood structure and tight building envelope helped achieve an Energy Use Intensity (EUI) of 10.5, more than 70 percent lower than similar building types. 
 
While energy efficiency and sustainability were important, so was budget. The project team compared the cost of the mass timber system to a steel design, which would have required interior finishes to achieve a similar aesthetic. While the initial cost of the timber structure itself was 13.5 percent higher, the team found significant savings through lower costs of interior finishes, a less expensive foundation due to the lighter weight wood structure, and faster construction. Projected savings using mass timber led to a total cost that was within 1 percent of a steel system, and they erected the Type V-B structure in just one month. 

Dicke Hall’s mass timber success story was too good not to share, so the project team hosted a conference on site while the project was under construction. The event gave design and construction firms from across Texas the chance to learn about the mass timber design, systems coordination, installation processes, and lessons learned. 
 

See a video tour of this project. 

Version History
  • Project uploaded by Cody Wortmann on 12-08-2022
  • Project last updated by WoodWorks Innovation Network (WIN) on 06-05-2025
Project Details
  • Year Built

    2022

  • Number Of Stories

    3

  • Bldg system

    Mass Timber

  • Square footage

    40,000

  • Construction Type:

    V-B

  • Building Type:

    Educational

  • Material Types:

    Mass Timber
    Cross-Laminated Timber (CLT)

Project Team
Version History
  • Project uploaded by Cody Wortmann on 12-08-2022
  • Project last updated by WoodWorks Innovation Network (WIN) on 06-05-2025
Need help with your own project?

WoodWorks can help find a team, technical details, and more.

WiA Announcement