Oakley Timber Lofts
Chicago, IL-
Bldg system
Mass Timber
-
No. Of Stories
4
-
Sq. Meters
3,483
Conversion of a two story warehouse building into a four story, 26 unit mixed use facility. Work included foundation strengthening, new heavy timber framing and masonry restoration.
-
Construction Cost:
$4000000
-
Construction Type:
III-A
-
Building Type:
Multi-Family (Apartments, Condos)
-
Material Types:
Glue-Laminated Timber (GLT or glulam), Timber-Frame / Post and Beam, Heavy Timber Decking, Hybrid (wood with steel or concrete)
Companies Involved:
-
Klein and Hoffman
Architect
-
Klein and Hoffman
Engineer
-
Structures Construction, LLC
General Contractor
-
Blue Slate Properties
Developers