- Project uploaded by [email protected] on 07-09-2025
- Project last updated by WoodWorks on 05-12-2026
Wells Transportation Station
Wells, METhe Wells Transportation Station expansion is a mass timber component of the Wells Area Improvement Project for the Amtrak Downeaster corridor. The project utilized Cross-Laminated Timber (CLT) for passenger platform roof structures, ADA elevator shaft panels, and the overhead pedestrian bridge roof system. Mass timber was selected for its dimensional precision, rapid installation, reduced jobsite disruption, and architectural warmth in an active public transit environment. The use of CLT enabled accelerated installation sequencing while maintaining tight alignment tolerances required for rail platform infrastructure.
Project Details
-
Year Built
2026
-
Number Of Stories
1
-
Bldg system
Mass Timber
-
Sq. Meters
278
-
Construction Type:
III-B
-
Building Type:
Civic (Recreational)
-
Material Types:
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Project Team
-
Quality Buildings Mass Timber Installer
-
SmartLam NA Manufacturer or Supplier
-
WoodCore Engineering LLC Delegated MT Engineering, Construction Means & Methods Engineering
-
WSP USA Building Structures Structural Engineer
-
Fennick McCredie Architecture Architectural Designer
-
Great Falls Construction General Contractor
-
Northern New England Passenger Rail Authority Developer / Owner
-
VHB Architect