- Project last updated by WoodWorks on 08-15-2024
 
Brentwood Public Library
Brentwood, CABrentwood Library, across from City Hall, replaces the small storefront library on that site and incorporates a vibrant children’s section that can be opened onto a secure outdoor reading room. A large community meeting room is attached to the Library and shares services - situated so that it can be used independently outside of Library hours. The western corner of the building, facing the City Park, offers a landscaped entry plaza and a small cafe with third-party vendor operation. The second story of the building is open at the center, allowing daylight and space conditioning to penetrate deep into the square floorplate.
The Library includes a double-height space over the lobby and features exposed cross-laminated timber floor and roof decks, and exposed steel framing. The project includes a CLT diaphragm on the roof and floor plates, which utilize plywood splines and screws to drag lateral loads into steel moment-resisting frames.
Project Details
- 
                      
Number Of Stories
2
 - 
                      
Bldg system
Mass Timber
 - 
                      
                        
Square footage
20,700
 
- 
                      
Construction Type:
V-B
 - 
                      
Building Type:
Civic (Recreational)
 - 
                      
Material Types:
Cross-Laminated Timber (CLT)
Hybrid (wood with steel or concrete) 
Project Team
- 
                      
                        
                      
                      
Holmes Structural Engineer
 - 
                      
                        
                      
                      
Megan Stringer Structural Engineer
 - 
                      
                        
                      
                      
Zander Sivyer Structural Engineer of Record
 - 
                      
Benjamini & Associates Civil Engineer
 - 
                      
Blanco Building Envelope Envelope Consultant
 - 
                      
Brandon Marshall Project Manager
 - 
                      
CALA Landscape Architect
 - 
                      
FOG Studio Architect
 - 
                      
Interface Engineering MEP Engineer
 - 
                      
Lathrop Construction General Contractor
 - 
                      
Mark Davis Interior Architect
 - 
                      
Mark Davis Design Architect
 - 
                      
Tiffany Redding Project Architect
 - 
                      
mack5 Cost Estimation
 
- Project last updated by WoodWorks on 08-15-2024