- Project uploaded by Suzanne Robinson on 10-24-2025
- Project last updated by Aaron Malone on 10-26-2025
Harvard University & American Repertory Theater, David E. & Stacey L. Goel Center for Creativity & Performance
Boston, MAThe David E. and Stacey L. Goel Center for Creativity & Performance will feature two flexible performance venues, light-filled rehearsal studio, teaching spaces, a spacious public lobby, and an outdoor performance yard - creating a vibrant new hub for artistic innovation and community connection. Constructed primarily of mass timber, the building structure is comprised of a glulam post and beam frame with CLT floor and wall panels. The CLT wall panels are utilized as both gravity load bearing elements and as shear walls in the lateral force resisting system.
Project Details
-
Year Built
2026
-
Number Of Stories
3
-
Bldg system
Mass Timber
-
Square footage
86,400
-
Construction Type:
V-A
-
Building Type:
Assembly (Worship, Restaurant, Theater, etc.)
-
Material Types:
Acoustic Underlayment
Mass Timber
Cross-Laminated Timber (CLT)
Glue-Laminated Timber (GLT or glulam)
Timber-Frame / Post and Beam
Heavy Timber Decking
Hybrid (wood with steel or concrete)
Structural Composite Lumber (e.g. LVL and LSL)
Project Team
- Project uploaded by Suzanne Robinson on 10-24-2025
- Project last updated by Aaron Malone on 10-26-2025