Whitney Pool

Boise, ID

The City of Boise and the Boise School District are proud to partner on the new Whitney Pool, located at Whitney Elementary School. This regional pool on the Boise Bench will feature an eight-lane lap pool, a slide, and a dedicated kiddie pool area with zero-entry for kids and families to enjoy. The facility also includes new indoor restrooms and locker rooms.

With space for a food truck, shaded seating, and a large pool deck, the pool complex will be able to accommodate 200 patrons at a time. Two buildings, matching in mid-century style, will be constructed using Mass Plywood Panels; one will include spaces such as locker rooms, showers, and restrooms. The second building will house staff areas and equipment storage.

Version History
  • Project uploaded by Andrea Tereault on 06-14-2026
  • Project last updated by Andrea Tereault on 06-16-2026
Project Details
  • Year Built

    2026

  • Number Of Stories

    2

  • Bldg system

    Mass Timber

  • Square footage

    3826

  • Construction Type:

    II-B

  • Building Type:

    Civic (Recreational)

  • Material Types:

    Mass Timber
    Cross-Laminated Timber (CLT)
    Structural Composite Lumber (e.g. LVL and LSL)
    Wood structural panels

Project Team
Firms with linked profiles are WIN members. As a non-profit, WIN is made possible through membership.
Version History
  • Project uploaded by Andrea Tereault on 06-14-2026
  • Project last updated by Andrea Tereault on 06-16-2026
Need help with your own project?

WoodWorks can help find a team, technical details, and more.

MassTimberTechRefGuide