Arlington Valley Road Business Park - Lot B

Arlington, WA

This concrete tilt‑up facility incorporates open‑web trusses engineered to create long clear spans and reduce the need for interior supports. The resulting uninterrupted floor area improves functional efficiency and allows for flexible layout configurations. The structural system also streamlines installation and mechanical integration. Drone imagery provides an elevated perspective that clearly illustrates these design efficiencies.

Version History
  • Project uploaded by Hayley Dunning on 12-11-2025
  • Project last updated by WoodWorks on 03-03-2026
Project Details
  • Year Built

    2022

  • Number Of Stories

    1

  • Bldg system

    Innovative Light-Frame

  • Square footage

    47,842

  • Construction Type:

    III-B

  • Building Type:

    Factory/Industrial (warehouse, storage, parking, etc.)

  • Material Types:

    Hybrid (wood with steel or concrete)
    Structural Composite Lumber (e.g. LVL and LSL)
    Open-web trusses

Project Team
Firms with linked profiles are WIN members. As a non-profit, WIN is made possible through membership.
Version History
  • Project uploaded by Hayley Dunning on 12-11-2025
  • Project last updated by WoodWorks on 03-03-2026
Need help with your own project?

WoodWorks can help find a team, technical details, and more.