Harder Mechanical Headquarters
Portland, OR-
Bldg system
Mass Timber
-
No. Of Stories
2
-
Sq. footage
27,000
In North East Portland sits the new Harder Mechanical Headquarters constructed with Mass Timber. This 27,000-square-foot, three-level project features a structural steel frame with 25,,000-square-feet of Cross Laminated Timber (CLT) floors and roof diaphragm with a BRBF lateral system. The city is to complete its new earthquake-resistant police and emergency management building. Swinerton is providing timber engineering services on the project for the Mass Timber/CLT scope. The project is exciting to be a part of as it shows that mass timber is becoming more commonplace in commercial office space.
-
Construction Cost:
$1 Million
-
Construction Type:
Unknown
-
Building Type:
Business (Office)
-
Material Types:
Mass Timber, Cross-Laminated Timber (CLT), Glue-Laminated Timber (GLT or glulam), Hybrid (wood with steel or concrete)
Companies Involved:
-
Ankrom Moisan
Architect
-
Timberlab
Timber Engineer/Fabricator
-
AAI Engineering
Structural Engineer
-
Harder Mechanical
Owner
-
Swinerton Mass Timber
Timber Furnish and Install
-
Simpson Strong-Tie
Connectors and Screws