Primeiro Edifício de Madeira

São Paulo, SP

First Mass Timber Building This project uses a post-and-beam structural system combined with CLT (cross-laminated timber) slabs. The roof system is a thermoplastic membrane, and the floor system consists of CLT panels. The walls are constructed using a combination of CLT and wood frame systems. Photography by Fran Parente.

Version History
  • Project last updated by WoodWorks on 04-28-2026
Project Details
  • Year Built

    2023

  • Number Of Stories

    3

  • Bldg system

    Mass Timber

  • Square footage

    1400

  • Construction Type:

    II-B

  • Building Type:

    Business (Office)

  • Material Types:

    Mass Timber
    Cross-Laminated Timber (CLT)
    Wood structural panels

Project Team
  • Rothoblaas
    Rothoblaas fasteners
  • Fran Parente Photography
  • MFMM Arquiteturaa Architect
  • Pedra Forte e Máximo Arquitetura e Engenharia General Contractor
Firms with linked profiles are WIN members. As a non-profit, WIN is made possible through membership.
Version History
  • Project last updated by WoodWorks on 04-28-2026
Need help with your own project?

WoodWorks can help find a team, technical details, and more.

MassTimberTechRefGuide