Star Lofts

Des Moines, IA

This multi-family housing project met both budget and sustainability goals by combining mass timber, including cross-laminated timber (CLT) decking and glue-laminated timber (glulam) columns and beams, with dimension lumber for a smart hybrid system.

Mass timber brought efficiencies in terms of schedule and sequencing; it also helped the developer save money by avoiding the cost of interior drywall because the wood could be left exposed. The light-frame dimension lumber added value in other ways; it was simple for crews to frame and insulate, and the contractor was able to easily run mechanical, electrical, and plumbing (MEP) systems from floor to floor while also meeting fire resistance and acoustical design requirements. An innovative flooring assembly achieves a 55 STC/50 IIC rating while leaving the top layer as exposed concrete, providing a finished floor surface that helped the project stay on budget.

By using mass timber, the project team achieved a 70 percent reduction in embodied carbon. High efficiency MEP systems will reduce operational energy by 28 percent. Built on the site of a dilapidated gas station, Star Lofts is Iowa's first Zero Carbon-certified building accredited by the International Living Future Institute (ILFI).

This video provides insights from the design of two mass timber multi-family projects in Des Moines, Iowa, focusing on their approach to fire-resistance and acoustics of the mass timber floor systems. See the other project, Junction Lofts

Version History
  • Project uploaded by Cutler Construction on 06-20-2023
  • Project last updated by WoodWorks Innovation Network (WIN) on 07-24-2024
Project Details
  • Year Built

    2024

  • Number Of Stories

    3

  • Bldg system

    Mass Timber

  • Square footage

    22,770

  • Construction Type:

    V-B

  • Building Type:

    Multi-Family (Apartments, Condos)

  • Material Types:

    Mass Timber
    Cross-Laminated Timber (CLT)
    Glue-Laminated Timber (GLT or glulam)
    Light-Frame
    Lumber

Version History
  • Project uploaded by Cutler Construction on 06-20-2023
  • Project last updated by WoodWorks Innovation Network (WIN) on 07-24-2024
Need help with your own project?

WoodWorks can help find a team, technical details, and more.