Candlewood Suites Fort Liberty (Bragg)
Fort Liberty, NC-
Bldg system
Mass Timber
-
No. Of Stories
6
-
Sq. Meters
11,353
Fort Liberty, NC (formerly Ft. Bragg) is the site of a six story mass timber Candlewood Suites Hotels. The hotel is 122,212 SF, six stories, 207 rooms. The sixth CLT structure in the Privatized Army Lodging (PAL) program designed to meet the highly restrictive military Anti-Terrorism and Force Protection (ATFP) requirements under the PAL program are expected to open in late 2024.
-
Construction Cost:
$58,000,000
-
Construction Type:
IV-C
-
Building Type:
Hotel/Motel
-
Material Types:
Mass Timber, Cross-Laminated Timber (CLT), Glue-Laminated Timber (GLT or glulam)
Companies Involved:
-
LK Architecture
Architect of Record, MEP Engineers
-
Chastain Skilman
Civil Engineer, Landscape Architect
-
SCA Consulting Engineers
Structural Engineer
-
Morrissey Engineering
Telecommunication Engineers
-
Kargozian & Case
Blast Resistance Design Engineer
-
LK Architecture
MEP Engineer
-
Lendlease
Design / Build Contractor
-
Rest Easy, LLC
Developer / Owner
-
MLP Solutions
Installation of the CLT and Glulam structure as well as fabricate and erect the structural steel and hardware.
-
Sterling Structural
CLT, Glulam
-
Rothoblaas
Tools and site waterproofing