- Project uploaded by Daniel Herr on 09-22-2026
- Project last updated by WoodWorks Innovation Network (WIN) on 10-01-2026
Fire Station 9
Hillsboro, ORThis 24,000 SF fire station features exposed glulam beams and a CLT roof deck, showcasing the beauty and strength of mass timber. The apparatus bay features impressive 94-foot clear-span glulam beams, providing the open space needed for fire operations.
A great example of how mass timber combines structural performance, functionality, and architectural character in a community facility.
Project Details
-
Number Of Stories
1
-
Système
Bois massif
-
Mètres carrés
2,229
-
Type de construction:
V-B
-
Type de bâtiment:
Gouvernement
-
Types de matériaux:
Bois massif
Bois Lamellé-Collé
Project Team
-
KPFF Consulting Engineers Structural Engineer
-
Western Wood Structures Supply, Fabricate, and Install Mass Timber
-
Daniel Herr Supply, Fabricate, and Install Mass Timber
-
Inline Construction GC
-
Rice Fergus Miller Architect of Record
- Project uploaded by Daniel Herr on 09-22-2026
- Project last updated by WoodWorks Innovation Network (WIN) on 10-01-2026
