- Project uploaded by [email protected] on 06-22-2025
- Project last updated by [email protected] on 06-23-2025
Detroit Lakes High School
Detroit Lakes, MNA major expansion and renovation of the high school to accommodate a growing district. Three additions were added, including a new ninth-grade wing, a larger commons and administrative area, and a fieldhouse with a full-size competition gym and elevated indoor track. The design also updated classrooms (e.g. art, FACS, tech labs) and improved security and building systems. The new gymnasium features long-span hybrid wood-and-steel trusses (Douglas Fir timber combined with steel) supporting the roof structure, showcasing the use of engineered wood for strength and aesthetics. These mass timber elements, along with wood finish accents in academic areas, bring natural warmth to the modernized school environment without calling attention to any particular supplier. Overall, the project created a state-of-the-art yet inviting campus while staying on schedule and budget
Project Details
-
Année de construction
2022
-
Number Of Stories
2
-
Système
Bois massif
-
Mètres carrés
24,453
-
Type de bâtiment:
Éducatif
-
Types de matériaux:
Bois massif
Project Team
-
Western Archrib Glulam
-
Gehrtz Construction Services General Contractor
-
Zerr Berg Architects Architect