Free Project Support from WoodWorks – Learn more

Viega LLC Headquarters

Broomfield, CO
  • Bldg system

    Mass Timber

  • No. Of Stories

    3

  • Sq. footage

    170,000

The design was derived from the pipe fitting products Viega manufactures. A sweeping curved roof encloses three stories of office space with breaks for floor-to-ceiling windows. An outdoor courtyard serves as a focal point of the campus, positioned to take advantage of sweeping views of the Flatirons, Long’s Peak and the Front Range. The design allows for expansion as the company continues to grow.

  • Construction Cost:

    $35 Million

  • Construction Type:

    III-B

  • Building Type:

    Business (Office)

  • Material Types:

    Cross-Laminated Timber (CLT), Glue-Laminated Timber (GLT)

Companies Involved:
Individuals Involved: