Hidden Creek Community Center
Hillsboro, OR-
Bldg system
Mass Timber
-
No. Of Stories
2
-
Sq. footage
51,000
This multi-generational community center was designed to integrate into a new 20-acre community park with a remnant forest. Its innovative green design and light-filled architecture bring together social, recreation, and cultural spaces that combine active and quiet lounge spaces, a 300-seat divisible community room, a multi-use classroom,multi-court gymnasium and group exercise rooms. The facility was planned and designed through an active public engagement process that solicited input from an 18-person Citizen Advisory Committee, public open house events, a statistically-valid survey, and an online survey.
-
Construction Cost:
$29 Million
-
Construction Type:
III-B
-
Building Type:
Civic (Recreational)
-
Material Types:
Mass Timber, Cross-Laminated Timber (CLT), Glue-Laminated Timber (GLT or glulam), Hybrid (wood with steel or concrete)
Companies Involved:
-
KLH Massive Wood
CLT Supplier
-
Opsis Architecture
Architect
-
KPFF Consulting Engineers
Structural Engineer
-
Code Unlimited
Consultant
-
Swinerton
CMGC and Timber Installer
-
City of Hillsboro
Owner
-
Timberlab
-
Calvert Company
Glulam Supplier
Individuals Involved:
-
Samir Mokashi
Code Consultant
-
Isaac Harris
Project Architect
-
Josh Richards
Principal-in-Charge
-
Zach Brehm
Project Manager
-
Chris Evans
Mass Timber Director
-
Graham Montgomery
Mass Timber Technical Director
-
Erica Spiritos
Mass Timber Preconstruction Manager
-
William Silva
Preconstruction Manager
-
Alex Wuebben
Project Engineer / Carpenter