Contractor / Installer
PRODUCTS & SERVICES
Subcontractor
Timber Procurement
Installation
Design Assist
Mass Timber Installation
Innovative Light-Frame and Mass Timber Project Portfolio:
Filter by building or material type
Theodore Roosevelt Presidential Library
Medora, ND
Under Armour Global Headquarters
Baltimore, MD
National Center for Indigenous Law, University of Victoria
Victoria, BC
Juno East Austin
Austin, TX
Mass Timber Demonstration Build at the 2024 International Mass Timber Conference
Portland, OR
Rosemary Brown Arena (South Burnaby Ice Arena)
Burnaby, BC
Clayton Community Centre
Surrey, BC
Pyrrha Headquarters - Vancouver
Vancouver, BC
The Offices at Southstone Yards
Frisco, TX
Frances Street
Vancouver, BC
Glenmerry Elementary School
Trail, BC
West Kelowna City Hall/Library Building
West Kelowna, BC
L’Alliance Francaise de Vancouver
Vancouver, BC
Man 6 Building
Vancouver, BC
Royal Columbian Hospital Expansion
New Westminster, BC
Southridge Elementary School
Surrey, BC
Surrey Christian School
Surrey, BC
411 Railway Street
Vancouver, BC
Dr. George Weir Elementary School
Vancouver, BC
University of Victoria’s New Student Housing & Dining Hall
Victoria, BC
Mass Timber Demonstration Build at the 2023 International Mass Timber Conference
Portland, OR
École des Pionniers de Maillardville
Port Coquitlam, BC
Trinity College
Toronto, ON
First Nations Health Authority Head Office
West Vancouver, BC
təməsew̓txʷ Aquatic and Community Centre
New Westminster, BC
Robert G. Kuhn Centre at Trinity Western University
Langley Township, BC
BCIT Tall Timber Student Housing
Burnaby, BC
Van Asselt School Addition
Seattle, WA
619 Ponce
Atlanta, GA
Timber House
New Westminster, BC
Mountain Equipment Co-op Head Office
Vancouver, BC
Wilson School of Design, Kwantlen Polytechnic University
Richmond, BC
UBC Tallwood House at Brock Commons
Vancouver, BC
INTRO
Cleveland, OH
Seabird Island Community and Cultural Centre
Agassiz, BC
University of Fraser Valley Dining Hall Expansion
Abbotsford, BC
Squamish Fire Hall No 1
Squamish, BC
Confederation Centre of the Arts (CCOA) - Revitalization Project
Charlottetown, PE
Leon Lebeniste
Squamish, BC
Marpole Community Centre
Vancouver, BC
Vienna House
Vancouver, BC
Place Maillardville Community Centre
Coquitlam, BC
Royal BC Museum Provincial Archives, Research and Collections Building
Victoria, BC
Grandview Heights Aquatic Centre
Surrey, BC
ABOUT Seagate Mass Timber Inc
Seagate Mass Timber Inc. is an award-winning mass timber design, procurement, and installation company based in Vancouver, British Columbia, with satellite offices in Seattle WA, that has executed some of the industry’s highest-profiled projects in the industry.
Founded in 2001as Seagate Consulting Ltd., Seagate made a name for itself by delivering quality workmanship on challenging mass timber buildings across North America. Our mission is to consistently deliver an exceptional service experience to our clients.
Before we built our first buildings with mass timber, we spent decades in commercial and residential construction. This means we bring more than mass timber knowledge to your team. We want to work with you to help solve problems before they affect your timeline or budget, through detailed scheduling, logistics and sequencing planning, and trade collaboration and coordination.
Our foundation is built on the experience and capabilities of our people along with our meticulous attention to detail and planning. The success of a mass timber project comes from all the planning long before we step onto the job site, and this is a part of the value Seagate brings to your project.
With the increasing demand for mass timber, Seagate has expanded its geographical footprint and is capable of handling projects of any size and complexity throughout the US and across Canada.
Planning & Install – As part of our install services, we go through an in-depth planning process which includes some of the following:
*Constructability review
*Scheduling and sequencing
*Site logistics and planning
*QA/QC program
*Safety review and planning
*Moisture management planning
Once we have completed our execution plan, we turn it over to our highly qualified and experienced site personnel to erect the structure.